Starting assumptions
- 15 windows
- Vinyl frames
- Mostly standard-size windows
- Mix of insert and full-frame installation
- Standard efficiency and sound openings
This is a planning range, not a contractor bid. Local labor, permits, site conditions, product choices, hidden damage, and contractor workload can move the final price.